Denver is planning a pedestrian bridge to connect the Broadway RTD station to the new Denver Summit FC soccer stadium.
The project aims to streamline transit access for fans attending matches at the new venue. By linking the stadium directly to the regional transit system, the city seeks to reduce traffic congestion and improve pedestrian safety in the surrounding area.
The estimated cost of the bridge is $23 million [1]. This infrastructure investment is designed to facilitate a seamless transition for commuters moving between the transit hub and the sports complex.
Construction is expected to continue over the next several years. Project officials said they have set a target completion date of 2030 [2].
The bridge will serve as a primary artery for supporters of Denver Summit FC. This connectivity is central to the development of the new stadium precinct, ensuring that the venue remains accessible via public transportation rather than relying solely on vehicle traffic.
City planners have integrated the bridge into the broader transit strategy for the Broadway RTD station. The project aligns with efforts to increase ridership on the regional rail system by providing direct, safe walking paths to major event destinations.
“The estimated cost of the bridge is $23 million.”
The integration of a dedicated pedestrian link between a major transit hub and a professional sports venue suggests a shift toward transit-oriented development in Denver. By investing millions in pedestrian infrastructure, the city is attempting to mitigate the typical logistical challenges of stadium traffic, potentially reducing the need for expansive parking lots and lowering the carbon footprint of game-day commutes.



