Quebec City will remove approximately 50 trees on Boulevard René-Lévesque starting the week of Aug. 19 [1], [2], [3].
The removals are a necessary step to clear the designated path for the city's upcoming tramway project. This move highlights the ongoing tension between urban infrastructure expansion and the preservation of the city's green canopy.
Municipal officials said the cuts are required to allow for the construction of the transit line. While the current phase focuses on Boulevard René-Lévesque, the project's scope is larger. Some reports indicate that up to 1,500 trees along the entire tramway route could be affected [4].
The timing of the removals has been a point of contention. Some reports indicate that the cutting will begin this week [2], though other sources suggest the city has not yet finalized a precise date for the start of the work [3]. Regardless of the exact start date, the city expects the bulk of the removals to occur this autumn [1].
The tramway project is a central pillar of Quebec City's transit strategy, aimed at reducing traffic congestion and improving public mobility. However, the removal of mature trees often triggers public backlash from residents concerned about urban heat islands, and the loss of local biodiversity.
City officials said the project is moving forward. The removal of these 50 trees [1] represents the immediate phase of a broader effort to prepare the urban landscape for the rail system's tracks and supporting infrastructure.
“Quebec City will remove approximately 50 trees on Boulevard René-Lévesque”
The removal of trees for the tramway illustrates the classic conflict in urban planning between sustainable transit goals and environmental conservation. While the tramway aims to lower long-term carbon emissions by reducing car dependency, the immediate loss of urban forestry can degrade local air quality and increase summer temperatures in the city center.



